Our blog.

Floored!

We are on a fast track to completion here at the winery and tasting room. A lot has been accomplished in the past few weeks.

In September, we poured concrete and installed drains in the winery.

In the midst of construction, we harvested our 2012 grapes. The final picking was the Cabernet Sauvignon in mid-October. Volunteers joined us on a beautiful, frosty morning.

Early in October, we installed windows and doors, sprayed foam insulation in the walls and hung the drywall.

We began putting up the hemlock siding, and finished the entrance.

The parking lot was paved and lines added.

We painted the walls.

We ordered canvasses of Sarah’s photos to grace one of the walls.

We are developing our website. Labels are approved and ordered.

There is tile on the bathroom floor.

We have a brick accent wall.

We are staining trim.

And we have a beautiful hardwood floor.

Next week we anticipate installing cabinets and light fixtures.

It won’t be long now! We can’t wait to show you our new facility and introduce our selection of fine wines!

Contact Us

This field is for validation purposes and should be left unchanged.